VIRTUS TECH · Our expertise
Building Management & Climate Control
Building management systems (BMS) and integrated control of heating, cooling and ventilation. Connected monitoring and control help teams manage daily building operation.
How we can help.
Planning of building monitoring and control around the systems specified for the project.
Integration of heating, cooling and ventilation controls with the building infrastructure.
Configuration, performance monitoring and support as operational needs change.
Plan BMS and climate control around daily operation.
A building management system should give the people operating a building useful information and clear controls. Start with the heating, cooling and ventilation equipment, the occupied zones and the decisions the team needs to make.
Map equipment and control zones
List the plant, room controllers and sensors already specified or installed. Record which areas have different operating hours or comfort needs, and agree the controls and information required for each zone.
Verify integration requirements
Collect model numbers and manufacturer documentation for the equipment to be connected. Confirm supported interfaces, available control points and the responsibilities of each supplier before agreeing the integration scope.
Define operation and follow-up
Decide who can change schedules and settings, which notifications require attention and how changes will be recorded. Include commissioning and a review of operation after the building is in use.
What to bring to a BMS consultation
- A building plan showing the proposed climate control zones.
- Equipment lists, model numbers and available control documentation.
- Occupancy hours and the team's monitoring priorities.
- Existing operating issues and the planned phases of work.
Products for your project.
Browse the relevant categories currently available in our catalog.
Browse product categories
- Building Management & Climate Control
- Building Management & Climate Control / Climate & Room Controls
- Building Management & Climate Control / Software
- Building Management & Climate Control / Ventilation / Accessories
- Building Management & Climate Control / Ventilation / Controls & Sensors
- Building Management & Climate Control / Ventilation / Fan Light Kits
- Building Management & Climate Control / Ventilation / Fans
Questions about building management systems
What should a BMS project define?
It should identify the systems being monitored or controlled, the information available from each, and the actions users can take. Agree schedules, user access, notifications and handover requirements alongside the equipment and integration list.
Can existing heating and cooling equipment be included?
That depends on the specific equipment and its supported controls or communication interfaces. A review of models and documentation is needed before promising an integration. Some equipment may require additional interfaces or a narrower control scope.
Will a BMS guarantee lower energy bills?
A fixed saving cannot be assumed. Results depend on the building, equipment, occupancy and operating settings. If energy performance is a project goal, agree what will be measured and how operation will be reviewed against the starting situation.
Can building controls be introduced in phases?
Phasing can be considered when the overall design accounts for future equipment and connections. Identify the first zones, required infrastructure and responsibilities for testing each phase so later additions fit the agreed approach.
Let’s plan the next step.
Tell us about your space and the stage of your project. We can help you define the systems, products and support you need.
